...safety is a must when aiming high.

Mounting trolley MTW 2001

Mobile platform for special operations, e.g. renovation and new construction, specifically on structures with existing noise barriers not exceeding 3.50 m.

  • Installation of ledge consoles before demolition of deck edge
  • Dismantling ledge consoles upon completion of deck edge with pre-assembled noise barriers
  • Structural inspection and repair work on bridge edges
  • Installing/dismantling supply lines underneath bridge superstructures
  • Simple on-site assembly of pre-constructed individual purpose-built components
  • Modular design of system components for maximum versatility
  • Save access within structure
  • Individually steered and braked wheel sets
  • Variable height running gear depending on height and inclination of building structure
  • Available with telescopic platform (up to 4.70 m) in conjunction with MTW 2000
  • Further details are contained in the instructions for assembly and use (in German)

Details

Item No.DesignationPacking
unit
Weight
kg/each
44260000Mounting trolley MTW 2001
(full version)
111,800.00